Preliminary design projects:
- Quantity drawings and photographic images
- Planning solution with furniture allocation (up to 3 options)
- 3D-visualization of the approved plan (1-2 options per room)

Working design projects:
- Quantity drawings and photographic images
- Planning solution with furniture allocation (up to 3 variants)
- Plan for structure assembly and dismantling
- Plan for layout of furniture
- Floor plan, layout of materials
- Ceiling plan
- Lighting scheme with bindings
- Layout of lighting, distribution of lines for circuit breakers
- Plan for the placement of sockets
- Scheme of underfloor heating
- Scheme of doorways
- Plan for layout of plumbing equipment
- Bathrooms layouts with material calculation
- Walls layouts of all rooms with calculation of materials and detailed sections on all decorative areas
- Specification for furniture and sanitary ware, with the sizes and bindings to the shops where you can buy them
- Specification for lamps
- Interior visualization in 3D StudioMax (1-2 variants per room)

Author's support:
- Control over the execution of construction works will prevent errors, deviations from the plan, save time and money 
- On-site inspection at least once a week 
- Shopping visit for a selection of furniture, decoration materials, accessories, textiles, lighting and bathroom fixtures, etc.
- Preparation of business proposals, indicating the supplier firms 
- Adjustments to the pilot project and the introduction of relevant edits 
- Consultations and work with related organizations (ventilation, air conditioning, water supply/sanitation)
 Author's supervision is not included in the cost of design work and requires conclusion of an additional contract.